Early Production Facility (EPF) for Three Years Period: – Conductor support structure “CSS” for 3 production wells (GNN3, GNN6 & GNN8) with a well bay supported by a MOPU – MOPU is intended to be installed adjacent to EPF conductor support structure “CSS” and used for operating topside surface facilities and utilities. – The GNN